The rules below reflect Boise's current code as of 2026 — verified against City of Boise zoning code Section 11-03-03 and confirmed in direct consultation with the City of Boise Planning department in May 2026.
Sources: Boise zoning code Section 11-03-03, Tables 11-02.9 (Dimensional) and 11-04.9 (Parking), and the City of Boise ADU One-Sheet.
1 ADU per lot. Detached and attached forms are both allowed, but only one accessory dwelling unit per parcel.
There is no parking requirement for the ADU itself. This is the most common misconception about Boise ADUs in 2026. The City of Boise Planning department confirmed this directly: a 2-bedroom ADU does NOT require an additional off-street parking space. The old rule that triggered an extra parking spot for larger ADUs has been removed.
Caveat: the primary residence's required parking must be maintained. If building the ADU consumes existing off-street parking for the primary house, you'll need to replace it. The ADU is exempt; the primary house's parking minimum still applies.
If your lot has a rear alley, the standard rear setback drops to 5 feet — and for an alley-loaded garage or parking structure under 1,000 sq ft, the rear setback can go to 0 feet (i.e., the structure can sit on the alley line).
But here's the catch: you must prove 22 feet of backup space for the alley-loaded structure. Boise alleys are typically 12 to 15 feet wide. The alley width counts toward the 22-foot requirement, but you'll still usually need 7 to 10 feet of additional clearance from the structure to make the math work.
This combination — alley access plus 22-foot backup proof — significantly expands the buildable envelope for detached-above-garage ADUs in alley-served neighborhoods. It's why central Boise neighborhoods with intact alley networks (East End, North End, parts of Vista) are some of our most active ADU territories.
Many central Boise neighborhoods sit inside a Historic Design Overlay. If your parcel is in an HD-O, any new structure — including an ADU — requires a Certificate of Appropriateness (COA) before a building permit will be issued.
The pre-approved plans (below) do NOT apply in Historic District. Even if you pick one of the free plans, you'll still go through the full COA process. Two-story ADUs in HD-O always require Historic Commission review.
Check your overlay status at the City of Boise GIS portal before designing anything.
No owner-occupancy requirement in most residential zones — you can build an ADU and rent it as an investment. Administrative planning review is required BEFORE you submit for the building permit. DSC's design-build coordination handles every phase: site review, planning review, COA review (if HD-O), building permit, and construction — under one project.
ACHD (Ada County Highway District) increased impact fees as of March 1, 2026 under Ordinance No. 254. ADU impact fees specifically went up by approximately 68%. These are real budget items separate from City permits and utility connection charges. The feasibility study itemizes what applies to your property.
ADU costs vary widely from project to project — sometimes by a factor of two or three on the same lot size. Rather than publish a generic dollar range that may or may not apply to your property, DSC delivers a specific cost range as part of your free, property-specific feasibility study. Below are the factors that drive that number up or down.
Note on the "free plans" headline: the City's pre-approved plans save the architecture-and-engineering design fee, but the plans are structural and layout only — they don't specify fixtures, finishes, or trim packages. DSC is developing pre-priced finish packages aligned with the free plans to give homeowners fixed-price clarity. Ask about this in your feasibility study.
In 2026, the City of Boise released 8 free, pre-approved ADU plans designed by Parke Architecture (led by architect Eamonn Parke, AIA). Each plan is named after a Boise-native bird and was designed specifically for the patterns of Boise's existing neighborhoods.
What pre-approved plans save:
What they don't save:
Browse Boise's Pre-Approved ADU Plans →
HD-O properties (Historic Design Overlay): add 1–3 months to either path for Certificate of Appropriateness review, Historic Commission review (mandatory for two-story; sometimes for single-story), and any period-appropriate material substitutions.
No. There is no parking requirement for the ADU itself, regardless of bedroom count. The City of Boise confirmed this directly in May 2026. The primary residence's required parking, however, must be maintained.
900 square feet OR 70% of your primary dwelling's floor area, whichever is smaller. Maximum 2 bedrooms and 2 stories.
One ADU per lot. Detached and attached forms are both permitted, but only one accessory unit per parcel.
No. Boise removed the owner-occupancy requirement in most residential zones. You can build an ADU and rent it as an investment property.
Alleys significantly help your buildable envelope. The standard rear setback drops to 5 feet, and for an alley-loaded garage or parking structure under 1,000 sq ft, the rear setback can drop to 0 feet — but you must prove 22 feet of backup space (which the alley width partially counts toward).
You'll need a Certificate of Appropriateness (COA) before any building permit is issued. Two-story ADUs require Historic Commission review. The free pre-approved plans do NOT apply in Historic District — you still go through the full COA process.
ADU costs vary widely based on type, finish level, site conditions, and existing utility capacity — sometimes by a factor of two or three on the same lot size. Rather than publish a generic range, DSC delivers a specific cost range for your property as part of your free feasibility study. Submit the form above for your property-specific number.
The plans themselves are free — that's a meaningful design-fee saving. But the plans don't include fixtures, finishes, or trim. You still go through finish selection. DSC is developing pre-priced finish packages aligned with the free plans for fixed-price clarity.
Pre-approved plan path: 6–9 months total. Custom design path: 12–18 months. Add 1–3 months for HD-O properties. DSC's design-build process compresses both timelines through milestone-driven scheduling.
Submit the form above for DSC's free ADU Feasibility Study. We'll send you a property-specific report within 48 hours covering zoning, dimensional fit, buildable envelope, parking, alley analysis, overlay status, and recommended ADU configuration.
The Boise ADUs below are DSC builds with their owners' actual Google reviews. They cover the full range of what an ADU can be — a recent primary backyard build, a rendering-and-animation-driven custom design, a garage-demolition-to-ADU conversion, and a Buildertrend-coordinated multi-phase project. Different starting points, same DSC process.
"Almost a full year, from concept to finished project, and it was all so worth it! It was a very collaborative process, and I'm so happy with my new space. It was especially great to know I was helping support so many small businesses, and families. Derek and all the subs were like extended family."
— Helen Brookman (Google review, 1 year ago)
View the Brookman ADU project →
"Nothing but good things to share about Derek Sammons Construction. My wife and I originally met with him to discuss an ADU build on the back of our property. Derek was on time, professional, and used state of the art software to create renderings of the vision with video animation. Once we gave the go ahead, Derek handled all of the permitting and construction process and communicated often where we were at in the build. The end result was nothing short of amazing. The quality craftsmanship and close attention to detail were evident everywhere you look."
— Bryan Swift (Google review)
"We used Derek Sammons for a backyard Accessory Dwelling build and we cannot recommend him enough. We worked closely with DSC during the entire process. From a complete demolition of our garage to creating a layout that worked with us, all while being honest and aware of our budget. It was great to get updates from Derek throughout the process as well. The ADU turned out even better than expected, we would absolutely recommend Derek to everyone!"
— Corey Majors (Google review)
"Derek did a fantastic job of managing our ADU build. He was professional, organized, and made sure that everything went smoothly. He used Builder Trend to keep everything organized, which was great for us to keep track as things moved along. I would highly recommend!"
— Shannon Ullman (Google review)
Four Boise ADU projects, four client experiences, one DSC process. The full set of DSC reviews is on our Google Business Profile — currently 5.0 stars across 11 reviews.
Your Personalized Report Includes a detailed, property-specific review designed to help homeowners understand whether their project looks feasible before spending money on full design, engineering, or construction planning.
Rather than offering broad or generic remodeling advice, the report focuses on the actual details of the property and the project concept. It looks at the proposed project type, approximate size, site conditions, layout considerations, and any known constraints that may affect the next steps. This gives homeowners a clearer picture of how their idea fits within real-world planning conditions.
The report also highlights the most important factors shaping the project early on, such as zoning fit, size limits, placement considerations, site access, structural or utility constraints, and timing expectations when relevant. If there are issues that should be addressed before moving forward, those are identified in a practical and easy-to-understand way so they can be planned for early instead of becoming surprises later.
Each report is written to explain what the findings mean for that specific property. Homeowners receive a straightforward summary of what appears workable, what may require confirmation, and what items deserve closer attention before the project moves into design or permitting. This helps turn scattered information into a more organized planning path.
The report also includes clear next-step guidance so homeowners know how to move forward with more confidence. Whether that means confirming site dimensions, reviewing placement options, accounting for utilities, or preparing for the next planning conversation, the goal is to help homeowners better understand feasibility, reduce uncertainty, and make smarter early project decisions.
Our highly trained team of professionals will guide you through your project. Our mission is to be highly organized, highly responsive and easy to communicate with.
A wealth of experience helps DSC to see things in the project that most others would miss. We host a comprehensive understanding of many construction techniques used over the years and we know how to spot a previous owners DIY fix that may lead to complications.
Our certifications are far in excess of a standard General Contractors Registration with the State. Our team hosts a variety of college degrees, Professional Certifications such as PMP and many other trade certifications.
Knowing the area helps us to understand local codes and requirements of the Planning and Building Departments as well as common construction techniques that were executed in the area over its many years of growth.
[Compelling closing statement about the value of the diagnostic and the importance of starting with accurate information before investing in a project.]